New pilot line in Rieder

A new pilot line was installed and commissioned in the second half of November at the Rieder substation in partnership with the MITNETZ Strom GmbH. The new installation includes permanent monitoring of all three power lines to capture even ad-hoc power or voltage peaks caused by earth faults or transient faults.